IMPLEMENTATION OF PROJECT MANAGEMENT MATURITY MODEL TO IMPROVE THE EFFICIENCY OF ACTIVITY OF LOCAL SELF-GOVERNMENTS

Authors

  • Oleksandra Niema Lviv Regional Іnstitute of Public Administration of the National Academy of Public Administration under the President of Ukraine

DOI:

https://doi.org/10.17770/sie2021vol6.6479

Keywords:

local self-government, management maturity level, maturity models, project competence, project management maturity model

Abstract

In the conditions of growing demands of society to the government, project activities cover not only traditional industries, but also the sphere of public administration. Critically important for the success of organization is the team (rather than individual) level of knowledge, skills of staff, and a certain maturity of the organization as a whole in the field of project management. However, the project activities of local self-governments cannot be considered effective or fully compliant with the modern requirements. The level of project competence of management teams of many territorial communities is still not sufficient for the implementation of tasks and functions, the production of relevant project ideas and their successful implementation. The aim of the research is to describe of project management maturity model for its implementation into the activities of the local self-governments from the positions of effectiveness of project management. The entry of the local self-government to a high level of project management maturity will reduce the negative impact of the human factor, systematically focus activities on meeting the needs of the community on a project basis, improve the quality of project management processes, and reduce unproductive costs. Methods used – analysis and synthesis, induction and deduction, logical generalization and comparison.

 

Downloads

Download data is not yet available.

Author Biography

  • Oleksandra Niema, Lviv Regional Іnstitute of Public Administration of the National Academy of Public Administration under the President of Ukraine
    PhD in Public Administration, Senior lecturer of the Department of Regional Management and Local Self-Government

References

Backlund, F., Choronner, D., & Sundqvist, E. (2014). Project Management Maturity Models – A Critical Review. A case study within Swedish engineering and construction organizations. 27th IPMA World Congress. Procedia – Social and Behavioral Sciences, 119, 837–846. DOI: https://doi.org/10.1016/j.sbspro.2014.03.094

Bezuhlyi, D. H., & Sharov, Yu. P. (2015). Pidkhid do otsiniuvannia rivnia proektnoi zrilosti orhaniv mistsevoho samovriaduvannia. Aspekty publichnoho upravlinnia, 3, 11-12, 89-97.

Bushuyev, S., & Wagner, R. (2014). IPMA Delta® and IPMA Organisational Competence Baseline (OCB): new approaches in the field of project management maturity. International Journal of Managing Projects in Business, Vol. 7, 2, 1–12.

Cooke-Davies, T., Schlichter, J., & Bredillet, C. (2001). Beyond the PMBOK® guide. Paper presented at Project Management Institute Annual Seminars & Symposium, Nashville, TN. Newtown Square, PA: Project Management Institute. Retrieved from https://www.pmi.org/learning/library/organizational-model-maturity-body-knowledge-7822

Degtyarev, M. A. (2015). Proektnaya zrelost i tsennostno-orientirovannoe upravlenie proektami. Retrieved from http://www.i-mash.ru/materials/economy/print:page,1,64524-proektnaja-zrelosti-cennostno-orientirovannoe.html

Dziubina, A. V. (2010). Model zrilosti upravlinnia proektamy dlia vitchyznianykh pidpryiemstv. Visnyk Natsionalnoho universytetu «Lvivska politekhnika», 6, 235–239.

Grant, K. P., & Pennypacker, J. S. (2006). Project management maturity: an assessment of project management capabilities among and between selected industries. IEEE Transactions on Engineering Management, 53(1), 59–68.

IPMA. (2015). IPMA Delta – moving organizations forward in translating strategy into results. Retrieved from https://www.ipma.world/assets/IPMA_Delta_Brochure_ENG_2015_Screen.pdf

Kertsner, G. (2003) Strategicheskoe planirovanie dlya upravleniya proektami s ispolzovaniem modeli zrelosti. M.: Kompaniya AyTi; M.: DMK Press, 320.

Malinina, M. V. (2011). Sovremennye modeli zrelosti organizacionnogo upravlenija proektami. Upravlenie proektami i programmami, 03(27), 228–239.

OGC. (2010). Portfolio, Programme and Project Management Maturity Model (P3M3). Version 2.1. Office of Government Commerce (OGC). Retrieved from http://miroslawdabrowski.com/downloads/P3M3/OGC%20branded/P3M3_v2.1_Introduction_and_Guide.pdf.

PMI. (2013). Organizational Project Management Maturity Model (OPM3®) – Third Edition. Knowledge Foundation. Newtown Square, PA: Project Management Institute (PMI), 205.

PMI. (2018). Pulse of the Profession®: Success in Disruptive Times. 10th Global Project Management Survey. Newtown Square, PA: Project Management Institute (PMI), 9.

PMI. (2020). Pulse of the Profession®: Ahead of the Curve: Forging a Future – Focused Culture. Report. Newtown Square, PA: Project Management Institute (PMI), 5.

Spilnota praktyk: Stalyi rozvytok. (2020). Retrieved from http://udl.despro.org.ua/

Ushakova, A., & Sharov, Yu. (2018). Vymiriuvannia y otsiniuvannia proektnykh kompetentnostei chleniv obiednanykh terytorialnykh hromad. Derzhavne upravlinnia ta mistseve samovriaduvannia, 3(38), 164–169.

Downloads

Published

2021-05-28

How to Cite

Niema, O. (2021). IMPLEMENTATION OF PROJECT MANAGEMENT MATURITY MODEL TO IMPROVE THE EFFICIENCY OF ACTIVITY OF LOCAL SELF-GOVERNMENTS. SOCIETY. INTEGRATION. EDUCATION. Proceedings of the International Scientific Conference, 6, 439-448. https://doi.org/10.17770/sie2021vol6.6479